|
|
| Power Cord Testers |
These testers are all designed to perform engineering and production acceptance of extension cords and power supply cords |
| Power Supply Cord Testers |
| Extension Cord Testers |
| |
| Model 461 Power Cord Test Station |
| Ideal for production testing of extension cords and/or power supply cords. |
 |
| This tester allows you to conduct: |
- Continuity
- Earth Bonding
- Polarity
- Short Circuit
- Open Circuit
- Dielectric Strength
|
| Capacity |
- Two, three or four wire cord sets
- Extension or power supply cords.
- Blunt cut, stripped or terminated cord ends.
|
| A combination of any three-test plugs and receptacles can be installed on the front panel. Each is mounted on a removable plate secured with quarter turn fasteners and internal fasteners for easy replacement. |
Compliance
The tester insures your compliance with the production test requirement normally specified by UL, CSA, VDE, TUV, BSI and JIS. Test details should be verified to your specific requirements. |
| |
| Details - Request for Quote |
| |
| |
| |
|
| |
| Model 463 Power Cord Test Station |
|
Ideal for production testing of power cord sets with up to 12 conductors. |
 |
| This tester allows you to conduct: |
- Continuity
- Polarity
- Dielectric Strength
|
| Capacity |
- Two to twelve conductor cord sets
- Cord sets with flying leads or blunt cut.
|
Multiple Test Receptacles
A combination of any three receptacles can be installed on the front panel. Each is mounted on a removable plate secured with quarter turn fasteners and internal connectors for easy replacement. |
The output leads are touched using the test probe in sequence to verify continuity and polarity. The dielectric test sequence is automatic once the cord end is place in the test chamber.
The tester insures your compliance with the production test requirement normally specified by UL and CSA. Test details should be verified to your specific requirements. |
| |
| Details - Request for Quote |
| |
|
|
|
| |
|
|